Skip to content
ENTITY PROFILE / KNOWLEDGE GRAPH

Glamsterdam upgrade

RSS

The Glamsterdam upgrade, originally set for Oct 26 2026 17:42:48 UTC on the Hoodi testnet (gas limit 200 M), was postponed on Oct 22 2026 after ChainSecurity identified 13 real‑world smart‑contract safety risks linked to the proposed EIP‑8037 (gas‑reserve for state creation) and EIP‑8038 (state‑access gas cost). The Ethereum Foundation confirmed that the testnet activation would not proceed and that a main‑net release is under review, with Dec 1, Dec 8, or Dec 9 on the horizon. Node operators should revert to earlier software versions or upgrade to clients that exclude the scheduled activation. The upgrade still aims to implement Enshrined Proposer‑Builder Separation (EIP‑7732), Block‑Level Access Lists (EIP‑7928), and other EIPs such as EIP‑8037 and EIP‑8038, pending safety verification. The Glamsterdam upgrade was tested on the Sepolia testnet. Glamsterdam upgrade was postponed on the Hoodi test network Glamsterdam upgrade was deferred by ACDE #248 Glamsterdam upgrade is applied to Hoodi testnet Glamsterdam upgrade removed the scheduled activation of the Amsterdam execution layer ChainSecurity identified security issues with the Glamsterdam upgrade Glamsterdam implements the EIP-8037 proposal to change gas for creating and accessing stored data Glamsterdam implements the EIP-8038 proposal to introduce a separate gas pool for creating new state Sepolia test network has the Glamsterdam upgrade live (activated on Oct. 6 2026) Glamsterdam was scheduled to go live on the Hoodi test network on Monday, Oct. 19 2026 Glamsterdam is expected to ship before the next Hegotá upgrade A Prysm consensus client release would remove the Glamsterdam upgrade from the Hoodi test network schedule Ethereum developers patched a flaw in the upcoming Glamsterdam upgrade Justin Traglia merged the fix into the Glamsterdam upgrade· Entity summary generated by Graphiti

RELATIONS
83Relations
CURRENT
63Current
EVENTS
1Events
REPORTS
11Source reports
KNOWLEDGE ATLAS0 entities · 0 relations
No public neighbors yet
Explore all published links of a node; previously discovered relations remain visible.

Relation timeline

BY VALID-FROM DATE
  1. Justin TragliaMERGEDGlamsterdam upgrade

    Justin Traglia merged the fix into the Glamsterdam upgrade

    Current1 sourceJustin Traglia
  2. EthereumPATCHEDGlamsterdam upgrade

    Ethereum developers patched a flaw in the upcoming Glamsterdam upgrade

    Current1 sourceEthereum
  3. EthereumUPGRADED WITHGlamsterdam upgrade

    Ethereum’s Glamsterdam upgrade is scheduled for Hoodi.

    Current1 sourceEthereum
  4. Glamsterdam upgradeIMPLEMENTSEIP-8037

    Glamsterdam implements the EIP-8037 proposal to change gas for creating and accessing stored data

    Current1 sourceEIP-8037
  5. Glamsterdam upgradePRECEDESHegotá

    Glamsterdam is expected to ship before the next Hegotá upgrade

    Current1 sourceHegotá
  6. Glamsterdam upgradeIMPLEMENTSEIP-8038

    Glamsterdam implements the EIP-8038 proposal to introduce a separate gas pool for creating new state

    Current1 sourceEIP-8038
  7. Glamsterdam upgradeTESTED ONSepolia network

    The Glamsterdam upgrade was tested on the Sepolia testnet.

    Current2 sourcesSepolia network
  8. Glamsterdam upgradePOSTPONED ONHoodi test network

    Glamsterdam upgrade was postponed on the Hoodi test network

    Ended 2026-10-261 sourceHoodi test network
  9. Glamsterdam upgradeHAS EIPSt Petersburg

    Glamsterdam network upgrade HAS_EIP EIP-8037 State Creation Gas Cost Increase

    Current1 sourceSt Petersburg
  10. Christine KimDISCLOSED CANCELLATION FORGlamsterdam upgrade

    Christine Kim disclosed the cancellation of the Glamsterdam upgrade

    Ended 2026-10-271 sourceChristine Kim
  11. Glamsterdam upgradeSCHEDULED ONHoodi’s Glamsterdam test

    Glamsterdam upgrade was scheduled to run on the Hoodi testnet

    Ended 2026-10-231 sourceHoodi’s Glamsterdam test
  12. Glamsterdam upgradeHAS EIPGloas

    Glamsterdam network upgrade HAS_EIP EIP-7928 Block-Level Access Lists

    Current1 sourceGloas
  13. ZtohovenTRACKSGlamsterdam upgrade

    EIP-7773 Glamsterdam upgrade TRACKS Glamsterdam network upgrade

    Current1 sourceZtohoven
  14. PrysmWOULD REMOVEGlamsterdam upgrade

    A Prysm consensus client release would remove the Glamsterdam upgrade from the Hoodi test network schedule

    Ended 2026-10-231 sourcePrysm
  15. Glamsterdam upgradeHAS EIPGothenburg

    Glamsterdam network upgrade HAS_EIP EIP-7732 Enshrined Proposer-Builder Separation

    Current1 sourceGothenburg
  16. Glamsterdam upgradeDEFERRED BYACDE #248

    Glamsterdam upgrade was deferred by ACDE #248

    Ended 2026-10-271 sourceACDE #248
  17. Glamsterdam upgradeREMOVED ACTIVATION OFAmsterdam execution layer

    Glamsterdam upgrade removed the scheduled activation of the Amsterdam execution layer

    Ended 2026-10-271 sourceAmsterdam execution layer
  18. EthereumPOSTPONED UPGRADEGlamsterdam upgrade

    Ethereum developers postponed the Glamsterdam upgrade

    Ended 2026-10-233 sourcesEthereum
  19. ChainSecurityIDENTIFIED SECURITY ISSUES INGlamsterdam upgrade

    ChainSecurity identified security issues with the Glamsterdam upgrade

    Current1 sourceChainSecurity
  20. Glamsterdam upgradeAPPLIED TOHoodi test network

    Glamsterdam upgrade is applied to Hoodi testnet

    Ended 2026-10-231 sourceHoodi test network
  21. Glamsterdam upgradeHAS EIPFrankfurt am Main

    Glamsterdam network upgrade HAS_EIP EIP-8038 State-Access Gas Cost Update

    Ended 2026-10-231 sourceFrankfurt am Main
  22. Glamsterdam upgradePLANNED LIVE ONHoodi test network

    Glamsterdam was scheduled to go live on the Hoodi test network on Monday, Oct. 19 2026

    Ended 2026-10-221 sourceHoodi test network
  23. Glamsterdam upgradeINCLUDESSepolia test deployment

    Glamsterdam includes Increase Calldata Floor Cost (EIP-7976)

  24. Glamsterdam upgradeINCLUDESEIP-8070

    Glamsterdam includes Cell-Level Deltas for Data (EIP-8136)

    Current1 sourceEIP-8070
  25. Glamsterdam upgradeINCLUDESEIP-8070 eth/72 Sparse Blobpool

    Glamsterdam includes Sparse Blobpool (EIP-8070)

  26. Glamsterdam upgradeINCLUDESEIP-8261

    Glamsterdam includes Partial Block Receipt Lists (EIP-7975)

    Current1 sourceEIP-8261
  27. Glamsterdam upgradeINCLUDESSepolia ETH

    Glamsterdam includes Deterministic Factory Contract (EIP-7997)

    Current1 sourceSepolia ETH
  28. Glamsterdam upgradeINCLUDESCointelegraph

    Glamsterdam includes ETH Transfers Emit a Log (EIP-7708)

    Current1 sourceCointelegraph
  29. Glamsterdam upgradeINCLUDES@SolanaFndn

    Glamsterdam includes Remove SELFDESTRUCT Burn (EIP-8246)

    Current1 source@SolanaFndn
  30. Glamsterdam upgradeINCLUDESShenzhen

    Glamsterdam includes Block Gas Accounting Without Refunds (EIP-7778)

    Current1 sourceShenzhen
  31. Glamsterdam upgradeINCLUDESHong Kong

    Glamsterdam includes Enshrined Proposer-Builder Separation (EIP-7732)

    Current1 sourceHong Kong
  32. Glamsterdam upgradeINCLUDESSepolia network

    Glamsterdam includes Increase Maximum Contract Size (EIP-7954)

    Current1 sourceSepolia network
  33. Glamsterdam upgradeINCLUDESGlimpse

    Glamsterdam includes State Creation Gas Cost Increase (EIP-8037)

    Current1 sourceGlimpse
  34. Glamsterdam upgradeCOMBINESGloas consensus layer upgrade

    Glamsterdam combines Gloas Consensus Layer Upgrade

    Ended 2026-10-221 sourceGloas consensus layer upgrade
  35. Glamsterdam upgradeSCHEDULED FORHoodi

    Glamsterdam is scheduled for activation on Hoodi testnet

    Ended 2026-10-221 sourceHoodi
  36. Glamsterdam upgradeINCLUDESEthereum Mainnet

    Glamsterdam includes Exclude Slashed Validators from Proposing (EIP-8045)

    Current1 sourceEthereum Mainnet
  37. Glamsterdam upgradeINCLUDESEIP-8282

    Glamsterdam includes Increase Exit and Consolidation Churn (EIP-8061)

    Current1 sourceEIP-8282
  38. Glamsterdam upgradeINCLUDESBrussels

    Glamsterdam includes Block-Level Access Lists (EIP-7928)

    Current1 sourceBrussels
  39. Glamsterdam upgradeINCLUDES@SolanaFndn

    Glamsterdam includes Builder Execution Requests (EIP-8282)

    Current1 source@SolanaFndn
  40. Glamsterdam upgradeINCLUDESNetherlands

    Glamsterdam includes State-access Gas Cost Update (EIP-8038)

    Ended 2026-10-231 sourceNetherlands

Relations are facts Graphiti extracted from reports, not verbatim quotes. An end date means later reporting showed the relation no longer holds.